Executive Leadership

Fractional CTO

A fractional CTO is not a part-time observer. It is accountable ownership of technical direction, team, and delivery, sized to what your business can currently justify - and structured so the role can be handed to a permanent hire without disruption.

When this helps

You are probably reading this because of one of these.

  • Engineering reports to a founder or COO who does not have time to lead it
  • You are scaling past the point where informal coordination works
  • The board needs a technical voice in the room they trust
  • A permanent CTO is the right destination, but not yet the right cost

How we help

A delivery sequence, not a discovery phase that never ends.

Every stage produces something you can act on independently, so the engagement can stop at any point without leaving you stranded mid-programme.

  1. Assess

    Two weeks inside the team, the code, and the numbers before recommending anything structural.

  2. Stabilise

    Fix what is actively costing you: release process, on-call, environment drift, or the reporting the board is missing.

  3. Build

    Hire and structure the team, set standards and architecture, and install a delivery cadence that holds without me.

  4. Succeed

    Recruit and onboard the permanent CTO, then hand over against documentation rather than conversation.

Delivery sequence for Fractional CTO, from first contact through to handover.

Efficiencies driven

The measurable change this engagement is aiming at.

Where teams usually start

  • Technical decisions escalate to whoever is least busy
  • No board-level view of engineering risk or progress
  • Hiring reactive and interview quality inconsistent

Where the engagement leaves you

  • Clear ownership of architecture and standards
  • Regular board reporting the executive team trusts
  • A sequenced hiring plan with a repeatable interview loop
Typical before and after state for Fractional CTO.

1-3 days

Per week, not five

Board

Level representation included

Planned

Succession to a permanent hire

What you receive

Artefacts that outlive the engagement.

  • Technology strategy and target architecture owned end to end
  • Engineering org design, hiring plan, and interview process
  • Delivery cadence, governance forums, and board reporting pack
  • Vendor strategy, contract review, and supplier management
  • Documented succession plan for a permanent CTO

Next step

Discuss a fractional role.

A short call is usually enough to work out whether this is the right engagement, and what it would cost. If it is not, I will say so.

Engagement

Executive Leadership

Per week, typically

1-3 days